7 Top-Rated Conversion Pros Near Brown Deer

Brown Deer's tub-to-shower search turned up 7 Google listings, and 7 of them made this ranked list. An average 4.7 rating across 358 reviews is what put them there, not one standout score. The estimate section up top doesn't move either way; this list only gives you somewhere to send the request.

Google Maps ratings checked · How we rank

Updated

Estimated cost in Brown Deer

Estimated cost in Brown Deer, WI
ProjectNational rangeBrown Deer estimate
Acrylic kit conversion$2,000 to $5,000$2,150 to $5,400
Acrylic kit with a framed glass door$2,300 to $6,200$2,500 to $6,650
One-piece fiberglass unit with a bench$4,100 to $8,500$4,400 to $9,150
Custom tile shower with a niche$6,200 to $12,500$6,650 to $13,500
Custom tile shower with a frameless door and the valve moved$7,050 to $14,900$7,600 to $16,000

Tub-to-shower prices here move only the labor part, roughly 50% of a typical bill, by how Milwaukee-Waukesha, WI pay for this work compares with the U.S. median.[2] Build your own estimate →

$30.85 median hourly wage for tile and stone setters in the metro

What Brown Deer's labor market means for this estimate

The local estimate for Brown Deer starts from a $30.85 hourly wage for shower and tile contractors, compared with $26.77 nationally.

Brown Deer runs 15% above the national figure for this trade.

A city like Brown Deer with higher local wages will show a higher adjusted estimate than the flat national range suggests on its own.

That's why the Brown Deer number below can differ from a neighboring city's estimate even for the same surround type.

U.S. median $26.77/hr

Data: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), May 2025.

7 top-rated conversion pros near Brown Deer

Sorted by a score that blends each business's star average with its total review count, highest combined score first. That score tracks reviews, not licensing, so whoever you contact, look up their license or registration yourself before you commit to anything.

  1. HoneyDew ImprovementsGeneral contractor · 5.0 out of 5 on Google · 83 Google reviews · Glendale 53209Google reviews
  2. Design Tech RemodelingBathroom remodeler · 4.8 out of 5 on Google · 37 Google reviews · Mequon 53092Google reviews
  3. Allrite Total Basement FinishingGeneral contractor · 4.7 out of 5 on Google · 111 Google reviews · Milwaukee 53209Google reviews
  4. North Shore Kitchen & BathBathroom remodeler · 4.7 out of 5 on Google · 33 Google reviews · Glendale 53217Google reviews
  5. Brillo Home RenovatorsGeneral contractor · 4.6 out of 5 on Google · 29 Google reviews · Milwaukee 53225Google reviews
  6. Absolute Drywall & InsulationGeneral contractor · 5.0 out of 5 on Google · 4 Google reviews · Milwaukee 53209Google reviews
  7. JM Remodeling & Construction, LLCBathroom remodeler · 4.0 out of 5 on Google · 61 Google reviews · Milwaukee 53209Google reviews

Before you compare a quote to this estimate

  1. Does the quote separate the surround cost from labor, or is it one lump sum?
  2. Is a permit fee included in the quote, or billed separately?
  3. Which add-ons from this page's calculator are already included, and which would cost extra?
  4. Does the quote assume the valve and drain stay in place, or does it include moving them?
  5. Is demolition and disposal of the old tub priced separately?
  6. If the crew opens the wall and finds rot or old plumbing, how does that change the price?

More on Wisconsin →

Acrylic kit conversion: nearby cities

Sources

  1. How Much Does It Cost to Install a Walk-In Shower?, Fixr, accessed 2026-09-30
  2. How Much Does a Tub to Shower Conversion Cost?, HomeAdvisor, accessed 2026-09-30
  3. Occupational Employment and Wage Statistics: Tile and Stone Setters (47-2044), U.S. Bureau of Labor Statistics, accessed 2026-09-30
  4. Cost to Plumb a Bathroom, Fixr, accessed 2026-09-30