Brookfield's Top-Rated Conversion Pros, by Google Rating

Brookfield pairs a wage-adjusted cost estimate with 9 top-rated conversion pros, since a contractor file isn't available here yet. Each business below cleared a review-count floor before its rating even factored into the ranking. Numbers first, names second: read the estimate, then use the list as a starting point for quotes.

Google Maps ratings checked · How we rank

Updated

Estimated cost in Brookfield

Estimated cost in Brookfield, WI
ProjectNational rangeBrookfield estimate
Acrylic kit conversion$2,000 to $5,000$2,150 to $5,400
Acrylic kit with a framed glass door$2,300 to $6,200$2,500 to $6,650
One-piece fiberglass unit with a bench$4,100 to $8,500$4,400 to $9,150
Custom tile shower with a niche$6,200 to $12,500$6,650 to $13,500
Custom tile shower with a frameless door and the valve moved$7,050 to $14,900$7,600 to $16,000

Tub-to-shower prices here move only the labor part, roughly 50% of a typical bill, by how Milwaukee-Waukesha, WI pay for this work compares with the U.S. median.[2] Build your own estimate →

$30.85 median hourly wage for tile and stone setters in the metro

What Brookfield's labor market means for this estimate

$30.85 an hour is the going rate for shower and tile contractors around Brookfield, versus $26.77 nationally.

Brookfield sits 15% above that national number.

Labor makes up 40% to 60% of a conversion's total cost, so a wage gap this size moves Brookfield's number measurably.

Treat the Brookfield estimate as your starting comparison point, not the national range.

U.S. median $26.77/hr

Data: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), May 2025.

9 top-rated conversion pros near Brookfield

Sorted by a score that blends each business's star average with its total review count, highest combined score first. That score tracks reviews, not licensing, so whoever you contact, look up their license or registration yourself before you commit to anything.

  1. Bath FitterBathroom remodeler · 4.9 out of 5 on Google · 968 Google reviews · Brookfield 53005Google reviews
  2. TightSeal Exteriors & BathsBathroom remodeler · 4.8 out of 5 on Google · 1,091 Google reviews · New Berlin 53151Google reviews
  3. T And J All In RemodelingBathroom remodeler · 4.9 out of 5 on Google · 60 Google reviews · Brookfield 53045Google reviews
  4. American Shower CompanyBathroom remodeler · 4.8 out of 5 on Google · 41 Google reviews · Waukesha 53186Google reviews
  5. Baths R UsBathroom remodeler · 4.7 out of 5 on Google · 35 Google reviews · Waukesha 53186Google reviews
  6. S.J. Janis Company, Inc.Bathroom remodeler · 4.6 out of 5 on Google · 42 Google reviews · Elm Grove 53122Google reviews
  7. Mad City Windows & Baths of MilwaukeeBathroom remodeler · 4.5 out of 5 on Google · 2,115 Google reviews · New Berlin 53151Google reviews
  8. TundralandBathroom remodeler · 4.5 out of 5 on Google · 191 Google reviews · Pewaukee 53072Google reviews
  9. Allen Kitchen & BathKitchen remodeler · 3.4 out of 5 on Google · 27 Google reviews · Brookfield 53045Google reviews

Before you compare a quote to this estimate

  1. Does the quote separate the surround cost from labor, or is it one lump sum?
  2. Is a permit fee included in the quote, or billed separately?
  3. Which add-ons from this page's calculator are already included, and which would cost extra?
  4. Does the quote assume the valve and drain stay in place, or does it include moving them?
  5. Is demolition and disposal of the old tub priced separately?
  6. If the crew opens the wall and finds rot or old plumbing, how does that change the price?

More on Wisconsin →

Acrylic kit conversion: nearby cities

Sources

  1. How Much Does It Cost to Install a Walk-In Shower?, Fixr, accessed 2026-09-30
  2. How Much Does a Tub to Shower Conversion Cost?, HomeAdvisor, accessed 2026-09-30
  3. Occupational Employment and Wage Statistics: Tile and Stone Setters (47-2044), U.S. Bureau of Labor Statistics, accessed 2026-09-30
  4. Cost to Plumb a Bathroom, Fixr, accessed 2026-09-30