8 Top-Rated Conversion Pros Near Port Hueneme

The estimate above holds regardless of what's below it; this city simply doesn't have a contractor file yet, so the list beneath pulls from Google instead. 8 businesses made the cut, each with a rating backed by enough reviews to count for something. Compare any quote against the estimate first; the list below is a separate data point, not a quality score.

Google Maps ratings checked · How we rank

Updated

Estimated cost in Port Hueneme

Estimated cost in Port Hueneme, CA
ProjectNational rangePort Hueneme estimate
Acrylic kit conversion$2,000 to $5,000$2,000 to $5,000
Acrylic kit with a framed glass door$2,300 to $6,200$2,300 to $6,200
One-piece fiberglass unit with a bench$4,100 to $8,500$4,100 to $8,500
Custom tile shower with a niche$6,200 to $12,500$6,200 to $12,500
Custom tile shower with a frameless door and the valve moved$7,050 to $14,900$7,050 to $14,900

Tub-to-shower prices here move only the labor part, roughly 50% of a typical bill, by how Oxnard-Thousand Oaks-Ventura, CA pay for this work compares with the U.S. median.[2] Build your own estimate →

$26.71 median hourly wage for tile and stone setters in the metro

What Port Hueneme's labor market means for this estimate

The local estimate for Port Hueneme starts from a $26.71 hourly wage for shower and tile contractors, compared with $26.77 nationally.

Port Hueneme runs about the same as the national figure for this trade.

A city like Port Hueneme with higher local wages will show a higher adjusted estimate than the flat national range suggests on its own.

That's why the Port Hueneme number below can differ from a neighboring city's estimate even for the same surround type.

U.S. median $26.77/hr

Data: U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics (OEWS), May 2025.

8 top-rated conversion pros near Port Hueneme

Sorted by a score that blends each business's star average with its total review count, highest combined score first. That score tracks reviews, not licensing, so whoever you contact, look up their license or registration yourself before you commit to anything.

  1. Dynomite Tile WorksTile contractor · 5.0 out of 5 on Google · 33 Google reviews · Not listedGoogle reviews
  2. AMERICAN SHORES CONSTRUCTIONGeneral contractor · 5.0 out of 5 on Google · 31 Google reviews · Oxnard 93036Google reviews
  3. Re-BathBathroom remodeler · 4.7 out of 5 on Google · 663 Google reviews · Oxnard 93036Google reviews
  4. J C T Construction IncConstruction company · 5.0 out of 5 on Google · 14 Google reviews · Not listedGoogle reviews
  5. Cal Prestige Construction and RestorationGeneral contractor · 4.8 out of 5 on Google · 26 Google reviews · Oxnard 93030Google reviews
  6. alltypeconstructionGeneral contractor · 5.0 out of 5 on Google · 10 Google reviews · Oxnard 93035Google reviews
  7. Avila Construction Inc.General contractor · 5.0 out of 5 on Google · 10 Google reviews · Port Hueneme 93041Google reviews
  8. Shamrock ConstructionGeneral contractor · 4.8 out of 5 on Google · 16 Google reviews · Oxnard 93035Google reviews

Before you compare a quote to this estimate

  1. Does the quote separate the surround cost from labor, or is it one lump sum?
  2. Is a permit fee included in the quote, or billed separately?
  3. Which add-ons from this page's calculator are already included, and which would cost extra?
  4. Does the quote assume the valve and drain stay in place, or does it include moving them?
  5. Is demolition and disposal of the old tub priced separately?
  6. If the crew opens the wall and finds rot or old plumbing, how does that change the price?

More on California →

Acrylic kit conversion: nearby cities

Sources

  1. How Much Does It Cost to Install a Walk-In Shower?, Fixr, accessed 2026-09-30
  2. How Much Does a Tub to Shower Conversion Cost?, HomeAdvisor, accessed 2026-09-30
  3. Occupational Employment and Wage Statistics: Tile and Stone Setters (47-2044), U.S. Bureau of Labor Statistics, accessed 2026-09-30
  4. Cost to Plumb a Bathroom, Fixr, accessed 2026-09-30